Abstract

In this work, a down-flow fixed bed anaerobic biofilm reactor filled by biological ceramsites were prepared to remove the high concentration of NO3− (> 20 g/L) from nuclear industry wastewaters. The effects of hydraulic retention time, the concentration of NO3−, the molar ratio of C/N and temperature on the removal efficiencies of NO3− were investigated. The results showed that the removal rate of NO3− with the initial concentration of 6 g/L can reach 99% or more by controlling the hydraulic retention time at 0.75 h, the molar ratio of C/N at 1.5 and the temperature over 18 °C. In the process, the NO2− was not accumulated, and the autotrophic denitrifying bacteria grow well in anaerobic biofilm reactors, proving a usable method for removing the high concentration NO3− from nuclear industrial wastewaters.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.