Abstract

Ontario Hydro is constructing a Tritium Removal Facility at its Darlington Nuclear Generating Station. The facility uses the Vapour Phase Catalytic Exchange and Cryogenic Distillation process to remove tritium from heavy water. This paper describes the background and design of Tritium Removal Facility.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call