Abstract

The construction industry is a key sector in the development and economic growth of Zambia, however, the industry has not escaped the challenges facing other countries worldwide in terms of delivering construction projects on time as stipulated in the contracts. This paper assesses the construction professionals' perception on the measures of minimising construction project delays in Lusaka - Zambia. The data used in this paper were derived from both primary and secondary sources. The secondary data was collected via a detailed review of related literature. The primary data was collected through a well-structured questionnaire which was distributed to construction professionals, which include: Architects, quantity surveyors, builders, civil engineers, land surveyors and project managers. Out of the 50 questionnaires sent out, 32 were received back representing 64% response rate. Data received from the questionnaires was analysed using descriptive statistics procedures. Findings from the study revealed that site management and supervision, effective strategic planning, clear information and communication channels, use proper and modern construction equipment and proper project planning and scheduling were the major measures of minimising construction project delays. The study contributes to the body of knowledge on the subject of minimising construction project delays in Lusaka, Zambia.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call