Abstract

This study presents a systematic on-site remediation case involving both heavy metal and organic contaminants in soil and groundwater in a historically industrial-used site in Shanghai, China. Lab-scale experiments and field tests were conducted to determine the optimum parameters for the removal of contaminants in soil and groundwater. It has been found that the remediation goal of hexavalent chromium in soil could be achieved with the mass content of added sodium hydrosulfite and ferrous sulfate reaching 3% + 6%. The total chromium in the groundwater was effectively removed, when the mass ratio of sodium metabisulfite was not less than 3g/L, and the added quick lime made pH value not less than 9. The concentrations of arsenic and 1,2-dichloropropane in the groundwater decreased evidently after extraction and mixing of groundwater. The pH and calcium chloride dosage added should be larger than 9.5 and 5g/L, respectively, to remove phosphate in groundwater. The removal efficiency of those contaminants was examined and evaluated after the on-site remediation. The results demonstrated that it was feasible to use the chemical reduction and solidification/stabilization methods for the on-site ex situ remediation of this site, which could be referenced for the realistic remediation of similar sites.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.