Abstract
Risk Based Inspection (RBI) would be able to establish an effective structural integrity management program, which reduces plant downtime, industry and regulatory burdens, and continue to maintain plant safety. The object of this research is final superheater of boiler coal fired power plant. Both straight tube and elbow tube of final superheater is in a medium risk category. Elbow tube has higher risk ranking because of the higher corrosion rate due to fly ash corrosion. The remaining life of straight tube is about 26 years and elbow tube is only about 7 years using corrosion rate calculations. Base on risk ranking and remaining life assessment, inspection planning can be developed for the next 3 years and prioritize at an elbow tube of the final superheater section. It can be one of the considerations for the company to pending yearly inspection in order to improve cost efficiency and reduce downtime.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.