Abstract

Relief-well requirements were investigated for a dynamic kill of a high-rate gas blowout from a deepwater reservoir to define any necessary special procedures or equipment. Results of the investigation show that a high injection rate and a special-design large-diameter injection riser are required to dynamically kill such a blowout with seawater. The injection riser is necessary to limit surface pump pressure during the high-rate kill operation. Procedures to complete the kill operation hydrostatically with heavy fluid following the dynamic kill are outlined.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call