Abstract

Summary In subsea environments, using large-bore/high-rate well designs is often a key contributor to the economic recovery of hydrocarbon resources. Their use is a necessity for accommodating the huge production capacity of the reservoirs they penetrate, with the major benefit of minimizing the number of wells necessary to develop a subsea field. The enthusiasm for using such well designs, however, must also be tempered by a clear understanding of the considerable well control risk they introduce—that risk being an increased level of difficulty in bringing such a well under control if a blowout were to occur. It is common that multiple relief wells, with their inherent complexities and time investment, would be simultaneously required to bring a big-bore blowout under control. The discussion of this fact is, though, not a common topic in industry literature. Instead, capping stacks have been more the focus. Much recent attention has been trained on ensuring that capping stacks are a viable method for quickly responding to a high-rate subsea blowout. This makes sense in light of the simpler, and publicly more palatable, concept of rapidly installing a capping stack on a blown-out subsea well. Still, a capping stack is only as reliable as the wellhead it must connect to. It is because subsea wellheads have such a high chance of being damaged during a blowout that relief wells will always be relied on as the ultimate backstop for ensuring that a subsea blowout can be brought under control. This reliance on relief wells, as they are traditionally envisioned, has limitations though when addressing a high-rate subsea blowout. Any subsea relief well will have inherent limitations resulting from the architecture of choke and kill lines (flow restrictions) and that of the crossover piping at the blowout preventer (BOP; erosion concerns). In the world of high-rate subsea blowouts, these limitations can sometimes translate into multiple relief wells being required to inject fluid at the rates necessary to affect a dynamic kill. However, the simultaneous use of multiple subsea relief wells to dynamically kill a single blowout has only been tried once in the industry's history. As a result, some countries require that stopping a blowout must be possible by drilling only one relief well. In this paper, we describe methods that can be implemented to transcend traditional relief well limitations via using a relief well injection spool (RWIS), with the ultimate goal of dynamically killing a subsea big-bore blowout using a single relief well. The technique varies with water depth. In both shallow-water (826 ft) and deepwater (8,260 ft) environments, the techniques are presented and analyzed that will allow using a single subsea relief well to perform a dynamic kill using 15 lbm/gal drilling fluid injected at 238 bbl/min. This particularly severe scenario, based on a big-bore gas well development in Western Australia, is chosen so that our results will have applicability to most subsea well control events that might arise in the future.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call