Abstract

This paper introduces the issue of reliability simulation studies of wind farm equipment in the process of an operation. By the improvement, retrofitting and insertion of new (optimal) solutions to change the quality and terms of the use of wind farm equipment, an evaluation of their impact on reliability under real conditions can be carried out over a long period of time. Over a brief period, testing the reliability of a technical facility is only possible in a simulation. The aspect of evaluating the reliability of wind farm equipment after the application of intelligent systems, including the Wind Power Plant Expert System (WPPES), can be tested in the manner of a simulation. It was accepted in this article that the operation of the wind farm equipment is detailed based on Markov processes. The results of such research activities are the development of reliable and appropriate strategies and an exploitation policy of PE facilities. The above-mentioned issues in such a comprehensive approach have not been fully presented in the literature. The process of exploitation of complex technical objects such as PE devices is a complex random technical and technological process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.