Abstract

This paper deals with a 2-unit cold standby redundant system with two types of failure and preventive maintenance (PM), from the point of view of cost-benefit analysis. The system has been studied using regenerative points.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call