Abstract

The requirements for the plate-bearing test of bore piles are determined by technical regulations for the construction of pile foundations for bridge abutments. There is no information about the plate-bearing test reliability in the literature. Bridge pile foundations as bridge elements relate to strategic and economically responsible objects of the transport infrastructure in the Russian Federation and must have a high reliability level at the design stage and operation.Purpose: Practical application of the reliability theory for plate-bearing tests to ensure control for construction and economic expenditures.Approach: The probabilistic approach in providing plate-bearing test reliability is conditioned by a random nature of the stress-strain state of soil under the bore pile tip and nonfailure operating probability.Research findings: Probability density functions allow restrictions such as loading stages and time without the reliability reduction of plate-bearing tests and the possibility of using the experimental load–soil settlement relation to substantiate the program requirements and economic feasibility of works.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call