Abstract

Detailed analysis of the reliability of over-pressure protection systems for well flowlines is necessary given the potentially catastrophic consequences of loss of containment. This paper presents a method for modelling such systems, using simplified equations and the beta factor method for the analysis of common cause failures. Various scenarios were modelled, representing different configurations of safety instrumented functions (SIFs) and pressure relief facilities. Consideration was also given to the number of wellheads on a wellhead tower, as well as the number of wellhead towers connected to a common central processing facility.Strategies such as providing a SIF on the common outlet from a wellhead tower, providing additional relief capacity and reducing sources of common cause failures were found to be effective in increasing the risk reduction factor achieved by the over-pressure protection system. Where such measures are insufficient, an alternative solution is to design all lines to the well shut-in pressure. This approach transfers the risk of over-pressure to the downstream separator, which must then be provided with adequate protection measures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.