Abstract

ABSTRACT This study presents a described methodology for reliability analysis, maintenance options, and system availability in all its steps and is graphically presented via a flowchart. The methodology was verified on an example of a cooling plant in the pharmaceutical industry. All the results are presented in diagram and tabular form. For this purpose, two subsystems were selected, and the respective analysis with the results was presented through all the described steps. The methodology is iterative in essence, which means that the procedure sometimes has to be repeated several times to obtain satisfactory results. It is based on a statistical approach; the calculation of individual parameters regarding functions in each step of the methodology was done by applying the Weibull and lognormal distribution. According to the obtained parameter β from the reliability analysis, both observed subsystems were slightly larger than 1, and showed slow equipment aging in the plant. The maintainability analysis for function M(t) also showed that the components of the power subsystem require a shorter time to replace the faulty or worn-out part rather than with the hydraulic cooling subsystem. The value of the parameter σ is relatively low, which means that a little dispersion exists around the mean value of failure numbers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.