Abstract

Preventive maintenance literature provides so many models that address single unit systems. However, many real life applications deal with multiple-unit systems. This work deals with a sequential imperfect preventive maintenance model and extends it to consider multiple units. The model targets specific system reliability by determining the maintenance timing for each unit in the system. The model helps to optimize the maintenance management process for multiple-unit systems.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call