Abstract

AbstractThe delay time concept is widely adopted in literature to model the two‐stage failure process of most industrial systems which can be divided into normal stage (from new to an initial point of a defect) and defective stage (from defect arrival point to failure). Most existing delay time models assume that the normal and defective stages are independent. A generalized delay time model is proposed in this paper by considering the dependence between the normal and defective stages which is reflected in the fact that they share the same external shock process. According to the definition of shot‐noise process, external shocks will incur random hazard rate increments in the two stages. The failure state is self‐announcing, whereas the defective state can only be detected by block‐based inspection or opportunistic inspection offered by unexpected shutdown due to unavoidable external factors. The system is correctively replaced upon the occurrence of a system failure or preventively replaced at the detection of a defective state. Based on the stochastic failure model and maintenance policy, this paper evaluates system reliability performance and average long‐run cost rate via a Markov‐chain based approach. Finally, a case study on a steel convertor plant is given to demonstrate the applicability of the proposed model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.