Abstract

Box-booms are widely used in some cranes. The strength of box-booms would continuously deteriorate with the use of time. In this paper, gamma process is employed to describe strength degradation when dealing with the overall stability of the box-boom. Furthermore, the total working time is not deterministic but random because of the random arrivals of tasks and the random working time of every task. By accounting for strength degradation and the random total working time, a time-dependent reliability-based design optimization (RBDO) model for the box-boom is proposed. An engineering case is used to illustrate the proposed model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.