Abstract

According to the required interval estimation precision of mean time between failures (MTBF) and reliability for numerical control (NC) machine tools, where failure processes can be described by the power law process model, the minimal testing truncated time and sample size of the reliability assessment test are given using Fisher information matrix method. The results show that there are two main factors which affect the truncated time and sample size. They are the log ratio of upper bound to lower bound and confidence of interval estimation for reliability indices, respectively. Among them, the minimal sample size increases significantly as the improvement of required precision of interval estimation for reliability indices and confidence increases, but the minimal testing truncated time is less affected by these two factors.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.