Abstract

Permanent magnet brake (PMB) is a safe and effective braking mechanism used to stop and hold the load in place. Due to its complex structure and high reliability, assessing the reliability of PMB remains a challenge. The main difficulty lies in that there are several performance indicators reflecting the health state of PMB, and they are correlated with each other. In order to assess the reliability of PMB more accurately, a constant stress accelerated degradation test (ADT) is carried out to collect degradation data of two main performance indicators in PMB. An accelerated bivariate Wiener degradation model is proposed to analyse the ADT data. In the proposed model, the relationship between degradation rate and stress levels is described by Arrhenius model, and a common random effect is introduced to describe the unit-to-unit variation and correlation between the two performance indicators. The Markov Chain Monte Carlo (MCMC) algorithm is performed to obtain the point and interval estimates of the model parameters. Finally, the proposed model and method are applied to analyse the accelerated degradation data of PMB, and the results show that the reliability of PMB at the used condition can be quantified quite well.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.