Abstract

The problem of estimation of confidence based on the testing results of elements of one of the main reliability parameters, the availability coefficient for a system with a loaded reservation and recovery of elements in various subsystems, is considered. Approximate confidence boundaries of this parameter are constructed for the case of a high reliability (“fast recovery”) of elements under the assumption that the average recovery time inherent in the elements of the system is small compared to the average time of failure-free operation. Estimates of the accuracy for the confidence boundaries constructed are also obtained.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call