Abstract

Objective: To compute the reliability/availability of casting system, a part of steel industry with a view to increase its productivity. Methods/Analysis: The reliability of casting system of a steel industry, consisting of four units, has been computed using Supplementary Variable Technique (SVT) by keeping the failure rates constant and varying the repair rates. From the transition diagram of the casting system, Chapman-Kolmogorov differential equations have been developed using mnemonic rule which are further solved using Lagrange’s method. The transient state availability of the system has been computed by Runge-Kutta fourth order method using MATLAB. Mean Time Between Failures (MTBF) has been calculated numerically. Findings: Besides increasing the plant availability and hence production, the findings of this paper may help in maintenance planning and scheduling of the said system. Novelty/Improvement: Reliability of the casting system of a steel industry has not been discussed so far.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.