Abstract
Article history: Received March 29, 2015 Received in revised format: May 12, 2015 Accepted May 12, 2015 Available online May 18 2015 The aim of this work is to present a reliability and profit analysis of a two-dissimilar parallel unit system under the assumption that operative unit cannot fail after post repair inspection and replacement and there is only one repair facility. Failure and repair times of each unit are assumed to be uncorrelated. Using regenerative point technique various reliability characteristics are obtained which are useful to system designers and industrial managers. Graphical behaviors of mean time to system failure (MTSF) and profit function have also been studied. In this paper, some important measures of reliability characteristics of a two non-identical unit standby system model with repair, inspection and post repair are obtained using regenerative point technique. Growing Science Ltd. All rights reserved. 5 © 201
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.