Abstract

Article history: Received March 29, 2015 Received in revised format: May 12, 2015 Accepted May 12, 2015 Available online May 18 2015 The aim of this work is to present a reliability and profit analysis of a two-dissimilar parallel unit system under the assumption that operative unit cannot fail after post repair inspection and replacement and there is only one repair facility. Failure and repair times of each unit are assumed to be uncorrelated. Using regenerative point technique various reliability characteristics are obtained which are useful to system designers and industrial managers. Graphical behaviors of mean time to system failure (MTSF) and profit function have also been studied. In this paper, some important measures of reliability characteristics of a two non-identical unit standby system model with repair, inspection and post repair are obtained using regenerative point technique. Growing Science Ltd. All rights reserved. 5 © 201

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call