Abstract

The study aims to analyse the reliability of the main conveyor system in an underground coal mine [Churcha (RO)] in India for estimating the suitable maintenance time. The main conveyor system in the mine has seven subsystems. The present study examined the six common probability distribution functions for fitting the time between failure (TBF) and time to repair (TTR) data. The TBF data in all the cases best fitted with Weibull 3-parameter distribution function except one. But, the TTR data in most of the cases best fitted with Lognormal 3-parameter distribution function. It was found that the subsystems C1, C2, C3, C4, C5, C6 and C7 require maintenance in the interval of 52.39, 65.28, 60.00, 84.66, 98.77, 20.89 and 112.85 h, respectively, to improve the reliability of the system to 80%.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call