Abstract

During the transition period of UHV AC/DC power grid construction in China, the dependence of the secure and reliable operation of power grids on the security and stability control system (SSCS) has been greatly enhanced. SSCS has shown a trend of large-scale, wide-area and complex in recent years. Considering the high reliability requirements of large-scale SSCS, the necessity of redundant configuration of important sites is first outlined in this paper. Moreover, the reliability indices including mis-operation rate and rejection rate of SSCS with and without remote redundancy are analyzed as well as the relationship between reliability indices and failure rate of single device. The key research directions of the reliability research of the SSCS under the new situation are further pointed out.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call