Abstract

The Mass Transit Railway Corporation (MTRC) is in the process of replacing its two existing centralized power and environmental SCADA systems and combining them into a single integrated SCADA system with a distributed architecture. As part of this replacement project, the existing dedicated point-to-point communication links to the remote terminal units will be replaced with an FDDI WAN. An objective of this replacement project is to improve the overall reliability of the control system. This paper presents a system reliability analysis demonstrating the reliability improvement gained by this replacement project. The analysis covers all the major components of the control system, including the SCADA system, the communication network, the remote terminal units and the power system. © 1998 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.