Abstract

The tower-line structure system of transmission line is a whole composed of tower structure, insulator, fittings and grounding wire and other components or subsystems. Its reliable operation is of great significance to the safe and stable operation of power system. In this paper, the reliability analysis method of transmission line tower-line structure system under the combination of ice and wind is modeled. Firstly, the reliability index of pole-tower structure, insulator, fittings and grounding wire is calculated by checking point method of first-order second-moment method. Then, the reliability calculation method of series structure system is used to calculate pole-tower structure, insulator, fittings and grounding wire. Finally, taking a straight tower and tension tower as examples, the system reliability indices of pole-tower structure, insulator, fittings and ground wire under ice-wind combination are calculated and analyzed, which can provide reference and guidance for disaster prevention of transmission lines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.