Abstract

In mining sectors, a dragline is used for removing overburden. The equipment consists of a number of subsystems. In mining industries, they have different bucket capacities and boom length. Dragline with a boom length of about 96 m and bucket capacity of around 24 m3 are most common. Sudden failure of any of its subsystem will stop the machine from functioning. The present paper investigates the criticality and reliability analysis of the subsystems of three draglines and overall reliability of each dragline. This study is made to assist engineers to identify the critical and sensitive subsystems in the draglines for better maintenance planning which will lead to enhance equipment availability, reduce the maintenance cost and production loss.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.