Test foundation walls were constructed in an area of planned subsidence. These crawl space-sized block bearing walls were located in the tension zone of a longwall panel. The test walls were 12.2 m (40 ft) long and were vertically loaded on top with soil bins to simulate the weight of a house. As the longwall proceeded past these test foundations, subsidence movements damaged the test structures. These damaged foundations were then structurally and aesthetically repaired by using a steel strap retrofit and applying a cementitious surface coating. The repaired test foundations underwent significant subsequent subsidence as an adjacent longwall was mined beneath. The response of the repaired foundation is summarized in this paper. The steel straps were also used to relevel another set of the test foundations after they were tilted and damaged by subsidence. First, the straps were applied to the block bearing walls, and then wall jacks were used to lift the upper portion of the walls to a level position. This releveling procedure is outlined with the results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.