Abstract
A Direct Target for a mid-term RIB ISOL-type facility is being developed at LNL, in the framework of the R&D for the SPES project [1]. Using a 40 MeV proton beam impinging on a UCx thick target of 2.5 g/cm3 density, a production rate of 1013 in target fissions per second is expected [2]. The crucial point, when short-lived isotopes are produced in the target, is to build systems (target + ion source) with good release properties and high efficiency. Monte Carlo simulations were performed using the GEANT4 toolkit [3] and the RIBO code [4] in order to optimize our target geometry and to estimate the average release time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.