Abstract

The author considers the following arrangements desirable: For radial feeders not in parallel?inverse-time-limit overload relays, with selective ground relays. Radial feeders in parallel?reverse-power relays in combination with reverse-time-element relays, or the balanced system. Single lines in tandem?definite and inverse-time-limit relays with progressively longer time settings near the generating station. Two or more parallel lines in tandem?inverse-time-limit relays at the points where the power leaves the station or substation, and overload relays in combination with reverse-power relays at the points where the power enters the substation; also, the balanced system preferable, when possible. Single line ring systems?inverse-time-limit relays, combined with reverse-energy relays, or, preferably, the balanced system. Parallel line ring systems?inverse-time-limit relays on the outgoing feeders at the generating stations, and a balanced interconnected combination of reverse-energy and inverse-time-limit relays at the receiving ends of the supply feeders. Tie lines?some balanced arrangement. Generator relays seldom used, but arrangements are suggested. Transformers?differential relays. Special grounding relays for extra high-tension cable feeders. Appendices A, B, C describe connections of reverse-power relays, relay testing and a special installation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.