Abstract

The arch dam of Jinping I hydropower station is on obvious high ground area, and the foundation rock masses may relaxed while excavating. Limit tensile strain is put forward to be relaxation criterion. By three-dimensional elastic-plastic finite element method analyzing, and imitating the dam excavating steps, the maximum principle strain of the dam foundation rocks is obtained. The research indicates that the maximum principal strain of upstream side is greater than that of downstream side commonly, and some area would relaxed, with 41m maximal relaxed depth. By engineer analogical research with Xiaowan arch dam foundation rock mass, which have relaxed while excavating, the calculate method and criterion of this paper are reliable, and they can provide reference for engineer design.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.