Abstract
The production scheduling of precast concrete (PC) is essential for successfully completing PC construction projects. The dispatching rules, widely used in practice, have the limitation that the best rule differs according to the shop conditions. In addition, mathematical programming and the metaheuristic approach, which would improve performance, entail more computational time with increasing problem size, let alone its models being revised as the problem size changes. This study proposes a PC production scheduling model based on a reinforcement learning approach, which has the advantages of a general capacity to solve various problem conditions with fast computation time and good performance in real-time. The experimental study shows that the proposed model outperformed other methods by 4–12% of the total tardiness and showed an average winning rate of 77.0%. The proposed model could contribute to the successful completion of off-site construction projects by supporting the stable progress of PC construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.