Abstract
On the basis of the static and dynamic testing of the bridge, the original structure model and the model based on stiffness reduction of Dongfu Bridge were analyzed and calculated with the finite element method. The main problem that the anti-shear area of the section in the middle pivot position is not enough is found. On the basis of combination of the passive and active reinforcement styles, a reasonable and feasible reinforcement plan on the girder beam of the main bridge is raised. These conclusions have an important reference value on the bridge reinforcement.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.