Abstract
The snow load of a space truss structure subjecting is unevenly distributed after snowstorm disaster, which caused uneven forcing and local damage of the members and roof purlin of the original space truss. The damaged members and roof purlins were strengthened and replaced in loaded condition in order to guarantee the space grid structural safety. The results during the construction process have shown that the presented strengthening plan is successful, which can provide us a good reference of the similar projection.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.