Abstract

The criteria used for successful rehabilitation of decks of major bridges when it is not feasible to close the bridge to traffic are described. These criteria are described with specific reference to recent work on the trestle spans of the Tappan Zee Bridge over the Hudson River near New York City. The results of an experimental program conducted with a full-scale, 10-m-span, lightweight concrete slab-steel beam composite bridge deck unit intended for later use in rehabilitating the through-truss decks of the bridge are also described. Loading history included 107 cycles of flexural fatigue loading followed by a flexural load capacity test. Measured values of capacity and midspan deflection at this ultimate load level are compared with simplified analytical predictions. A description of the actual rehabilitation process used on the Tappan Zee Bridge deck is also provided.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.