Abstract

For hydroelectric stations having long conduits it is especially important to thoroughly examine the problems related with the possibility of eliminating surge tanks or idle discharges. The problems include: the role of the station in regulating the active power in the power system, the selection of the main features for calculating unsteady regimes, and the selection of the generator flywheel masses and permissible value of temporary unsteady running of the unit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.