Abstract

From 2004 to 2018 the Regulatory Asset Base (RAB) of electricity networks across Australia's National Electricity Market tripled in value, from $32 billion to $93 billion. The run-up in the capital stock was driven by forecast demand growth and a tightening of reliability standards. But demand contracted from 2010 to 2015. With a rising RAB, contracting demand and a regulated revenue constraint, an adverse cycle of falling demand and sharply rising tariffs appeared to be emerging. Some networks were characterised by significant investment mistakes in retrospect, and perhaps unsurprisingly, various consumer groups and regulatory bodies argued assets should be stranded or written-off with network tariffs reduced. From 2015 to 2018, energy demand increased once again. In this article we present a method for dealing with stranded assets under uncertainty; rather than permanently stranding assets that fail a used and useful test, we reorganise the financial and economic affairs of a template network utility and “Park” excess capacity, issue credit-wrapped bonds to temporarily finance the stranded capital stock, then re-test the Parked Assets at the end of each five-year regulatory determination. Parked Assets can then be “Un-Parked” and returned-to-service in line with connections growth, load growth, or both. This produces an immediate reduction in network tariffs under our generalised assumptions, but scarce government balance sheet capacity is necessarily utilised and recovery risk is transferred from shareholders to taxpayers. Accordingly, a Park and Loan policy is not a costless exercise.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call