Abstract

Eleven implementation plans were prepared. They represent some 21 reservoir-site developments and 48 geothermal power plant developments. The plans consist of three integrated elements: (1) a bar-chart schedule that depicts interdependencies among activities and shows significant milestones on the path from initial exploration to power on-line, (2) task descriptions, and (3) the responsible performers. During the preparation of the implementation plans, the tasks required for resource development at each KGRA were defined on a generalized work breakdown structure (WBS) diagram. A generalized WBS dictionary (task descriptions) was also compiled. In addition, a specific WBS for each KGRA was prepared in a tabular and indented format. The tasks formed the basis for the schedular activities. Institutional responsibilities, based upon the WBS, were identified and are also shown on the tabular WBS. In this manner, implementation plans evolved whose schedular, task, and responsibility elements were integrated with one another. In order to provide logically consistent time estimates, and a reasonable basis for comparison, schedule modules were developed for some recurring activities which are essentially common to all KGRAs. In the preparation of multiple plant schedules for a given KGRA, the interactive effects of power development on the ancillary resources of the areamore » were considered so that interfaces and constraining situations would be identified. Within Imperial County, this process was taken one step further to include the influence that development at the several close-lying KGRAs would have upon one another. A set of recommendations for the accelerated development of geothermal energy resources was prepared and the potential implementors were suggested.« less

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call