Abstract This paper presents the procedures and effects of strip pre-drainage of coal seam gas by long boreholes with large diameter. The investigation was carried out by onsite experimental measurements and laboratory numerical modeling. Onsite investigation results from the six roadways of Dingji Mine show that the technology has dramatic effects of stress release and gas pre-drainage. For a single borehole, its effective influential radius reaches 2.3m after five day drainage, with pre-drainage rate over 30%, residual gas contents ranging from 2.34∼4.53m 3 /t, coal seam deformation over 1.1%. Boreholes were drilled according to a refined pattern of boreholes based on these parameters, which has highly increased the rate of roadway development to over 170m per month and the maximum to 212m per month. Of all routine inspections, only 5.38% indicates some degree of outburst potential after this technique is applied. The majority of inspections with outburst potential are limited to locations where abnormal disturbance occurs because of geological structures, indicating enhanced and intensified borehole drilling is necessary when development is close to geological structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.