Abstract

A combined time-series-based regression forecasting and GRA-IPSO-BP structure is proposed to forecast the electricity replacement forecasts using a time series model based on the triple exponential smoothing forecasting method. The forecast results are corrected using the GRA-IPSO-BP structure. The results of the algorithm show that using a combination of time series and GRA-IPSO-BP structure can significantly improve the forecasting accuracy of electricity replacement compared to single-method forecasting.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call