Abstract

The future demand for data and the role of gigabit networks are central issues in the context of Next Generation Access (NGA) network roll-out. Based on a generic model, which allows to predict unconstrained future broadband demand in different regions and countries, the authors compare the results for Germany, the UK and the Flemish region, and discuss reasons for the different outcomes. The generic market potential model thereby allows to project the future demand for bandwidth from residential customers on the basis of applications and their bandwidth needs, user profiles and population structure on a household level. Despite a general trend towards an increasing need for broadband, there are clear differences. On the one hand, these point to the relevance of socio-demographic factors for broadband adoption. On the other hand, the relatively high proportion of refusals shows that there is still a need for further educational work on the part of public authorities and providers. Finally, it has to be stated, that our forecast relies on the assumption that connectivity and thus that the availability of area-wide gigabit capable broadband access does not represent a bottleneck.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.