Abstract

This work aims reflect on the turnover process between two phases of a power plant construction project - erection and commissioning. Using real data from the project, we propose a new turnover process. Our approach uses recent earned value based schedule methods and try ensure a more effective commissioning regarding main schedule priorities. We believe that in consequence we are able reduce the project duration and improve the client-contractor relationship on site. Our contribution the improvement of this field intends be multiple: First, we warn for potential mistakes while enquiring the project schedule performance using traditional approaches, namely on projects facing different productivity rates during their lifecycle. Second we demonstrate how emergent earned schedule method improves this monitoring process. Finally, overcome the problem we faced during our power plant construction project calculate and communicate the to complete schedule performance index in time units, we propose a new approach. Our new approach was validated with real data from the real project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.