Abstract

Summary form only given. An ISO's real-time operation faces many challenges, e.g., how to manage load forecasting error, how to incorporate corrective actions and system ramping capability in post-contingency state, and how to dispatch the system during reserve shortage or excessive generation. These operational issues are further complicated by their interactions with the real-time market. As a result, it is critical to have a market design coping with the operations. In this presentation, we address some of the prominent challenges in ISO-NE's real-time operation and market. Possible remedies in terms of adjustments to the current real-time market design are discussed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call