Abstract

According to government regulations, the emergency planning zone (EPZ) of a nuclear power plant (NPP) must be designated before operation and reevaluated every 5 years. Corresponding emergency response planning (ERP) has to be made in advance to guarantee that all necessary resources are available under accidental releases of radioisotope. In this study, the EPZ for each of the three operating NPPs, Chinshan, Kuosheng, and Maanshan, in Taiwan was reevaluated using the MELCOR Accident Consequence Code System 2 (MACCS2) developed by Sandia National Laboratory. Meteorological data around the nuclear power plant were collected during 2003. The source term data including inventory, sensible heat content, and timing duration, were based on previous PRA information of each plant. The effective dose equivalent and thyroid dose together with the related individual risk and societal risk were calculated. By comparing the results to the protective action guide and related safety criteria, 1.5, 1.5, and 4.5 km were estimated for Chinshan, Kuosheng, and Maanshan NPPs, respectively. We suggest that a radius of 5.0 km is a reasonably conservative value of EPZ for each of the three operating NPPs in Taiwan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.