Abstract

Reengineering production systems in an attempt to meet tight cost, quality and leadtime standards has received considerable attention in the last decade. In this paper, we discuss the reengineering process at the Royal Netherlands Naval Dockyard. The process starts with a characterisation and a careful analysis of the production system and the set of objectives to be pursued. Next, a new production management structure is defined after which supporting planning and control systems are designed and a number of organisational changes are carried through. In this way, the Dockyard may combine high technological capabilities with an excellent logistic performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.