Abstract

When parts are on the shop floor and in manufacture, they are either waiting for or are being attended by a machine or a material handling equipment. When several workstations are required to process a job, the machining and moving of the parts between the workstations can be very time consuming unless it is properly planned. When poorly planned, the processing and handling decision can significantly affect the length of time the job spends in the shop. In this paper, a methodology for planning the machining and the material handling activities for the manufacture of small to medium size batches in a job shop is presented. The model determines the machining rate at each workstation and the unit-load size to use in handling the batch through the production system in order to minimize the total production time. The procedure is easy to implement on a microcomputer for use in planning shop production activities.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.