Abstract

An NP-hard optimization problem dealing with the assignment of operations to the workstations and spindle heads of a machining transfer line is studied. Precedence, inclusion and exclusion constraints among the operations, capacity and cycle time constraints exist. The objective is to minimize the cost of the line being designed. This problem has been referred to as the Transfer Line Balancing Problem (TLBP) and is a generalized case of well-known simple assembly line balancing problem. In literature, few exact methods have been proposed to solve it. Since the problem is NP-hard, those that do are too time-consuming for solving real life industrial cases. This paper presents effective pre-processing methods which can reduce the size of the initial problem in order to shorten the solution time required. These methods are evaluated on three datasets of new generated problem instances and known benchmarks. The results obtained show that for certain cases the solution time can be significantly reduced when these pre-processing methods are applied.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.