Abstract
This paper present an instance transformation procedure to modify known instances of the resource-constrained project scheduling problem to make them easier to solve by heuristic and/or exact solution algorithms. The procedure makes use of a set of transformation rules that aim at reducing the feasible search space without excluding at least one possible optimal solution. The procedure will be applied to a set of 11,183 instances and it will be shown by a set of experiments that these transformations lead to 110 improved lower bounds, 16 new and better schedules (found by three meta-heuristic procedures and a set of branch-and-bound procedures) and even 64 new optimal solutions which were never not found before.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.