Abstract

The major causes of environmental and social conflicts were analyzed through the samples of the construction and the management for tidal power plant abroad and inland. Based on the results, the eco-friendly and socially acceptable policy instruments for decreasing the scope and intensity of the conflicts were explored. Regarding environment issues, it was found that the tidal power project resulted in decreasing in tidal range and area of intertidal zone and in damaging to tidal flat and wetland conservation area. Also there are the characteristic change of tidal current and biological effect, etc. The major environmental and social conflicts were resulted from the distrust of environmental results to environmental impact assessment and prior environmental review and the distrust of project feasibility study, and insufficient activities of public participation. In this study, introduction to joint fact-finding(JFF) was reviewed as the measure of minimizing environmental and social conflicts.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call