Abstract

Manufacturing companies face a significant challenge when developing their master production schedule, navigating unforeseen disruptions during daily operations. Moreover, fluctuations in demand pose a substantial risk to scheduling and are the main cause of instability and uncertainty in the system. To address these challenges, employing flexible systems to mitigate uncertainty without incurring additional costs and generate sustainable responses in industrial applications is crucial. This paper proposes a product-driven system to complement the master production plan generated by a mathematical model. This system incorporates intelligent agents that make production decisions with a function capable of reducing uncertainty without significantly increasing production costs. The agents modify or determine the forecasted production quantities for each cycle or period. In the case study conducted, a master production plan was established for 12 products over a one-year time horizon. The proposed solution achieved an 11.42% reduction in uncertainty, albeit with a 2.39% cost increase.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.