Abstract
This paper is devoted to developing an integrated model to minimise energy consumption while maintaining desired productivity in Bernoulli serial lines with unreliable machines and finite buffers. For small systems, such as three- and four-machine lines with small buffers, exact analysis to optimally allocate production capacity is introduced. For medium size systems (e.g. three- and four-machine lines with larger buffers, or five-machine lines with small buffers), an aggregation procedure to evaluate line production rate is introduced. Using it, optimal allocation of machine efficiency is searched to minimise energy consumption. Insights and allocation principles are obtained through the analyses. Finally, for larger systems, a fast and accurate heuristic algorithm is presented and validated through extensive numerical experiments to obtain optimal allocation of production capacity to minimise energy consumption while maintaining desired productivity.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.