Abstract

The orthopedics clinic at an academic medical center has low patient satisfaction rates for patients that require an X-ray and have difficulty ambulating. The project aimed to reduce the 'non-value-added' time during appointments by using Lean and Six Sigma methodologies and enhance patient experience. An analysis of the current state was conducted using Gemba walks, interviews with subject matter experts and an interrupted time study to assess baseline data. The project was implemented using a three-phase Kaizen event approach. Interventions implemented included: (i) re-engineering patient flow and (ii) standardizing appointment scheduling guidelines. The 'non-value-added' appointment time was measured post-intervention and it decreased from 17 to 8 min (51%), and 87% (N = 47) of patients rated the scheduling process positively. Lean, Six Sigma and Kaizen improvement methodologies are invaluable tools to improve operational efficiency. The implemented interventions enhanced patient experience and improved clinic efficiency.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.